Tim and James have literally battled through the worst of our Winter weather with the result that the base and floor of the composting toilet have now been completed along with the framework to support the upper walls and door frame. The photograph below (taken at the pruning workshop event) was kindly sent in by Helen. Yes, that is real snow on the ground and the temperature was as cold as it looks in the photo.
No comments:
Post a Comment